Project Snapshot
Location: Marks & Spencer, Cribbs Causeway, Bristol
Building Type: Retail store within a regional shopping centre
Services Delivered: Glazing condition survey, atrium glazing refurbishment, EPDM gasket replacement, glazing leak repair, high level glass replacement and solar control film
Access Method: IRATA-trained rope access technicians, existing gantry systems and crane lifts
Project Type: Phased out-of-hours night works within a live retail store
Project Date: April to August 2025
Dynamic Access delivered a comprehensive atrium glazing refurbishment across three overhead glazed atriums at Marks & Spencer, Cribbs Causeway, together with the high level replacement of six defective glazing units. The programme of works was completed in 2025 as phased out-of-hours night works, allowing the store to remain fully operational throughout.
The Brief
The Marks & Spencer store at Cribbs Causeway is naturally lit by three overhead glazed atriums positioned directly above the sales floor. Dynamic Access was appointed to refurbish the atrium glazing, rectify ongoing overhead glazing water ingress and address any defective glazing units identified during the works.
Areas of water ingress had been identified within the store, and the external weathering components of the glazing system were approaching the end of their serviceable life. A previously retrofitted film had also obscured the true condition of the glass. Following its removal, we carried out a full glazing condition survey and recorded every defect across the three atriums. All works were to be undertaken outside of trading hours, ensuring no disruption to store operations.
The Challenge
With the atriums positioned directly above a live retail environment, every element of the works involved working at height over the sales floor, with the store required to be fully operational each morning.
Our condition survey identified eight defective glazing units: two cracked units, four suffering from hermetic edge seal failure, and two earlier replacements installed in an incorrect tint, which were visibly inconsistent with the surrounding glazing. With the heaviest replacement units weighing approximately 170kg, a crane lift strategy from outside the building was required, again delivered out of hours.
No O&M information was available for the original glazing, so the replacement specification had to be determined on site to match the existing glazing.